ULH STREAM Installation Process

1. Before Installation

2. Adjust the position of reinforcing rod

Adjust the position of reinforcing rod

  • Check the anchor positon by adjusting the position of reinforcing rods before fitting anchor bolts.

3. Setting fixed guide

  • Decide the shape and number of anchor bolts by calculating structualstrength and fitting with corrosion treatment.

4. Setting control gate

Setting the contorlgate and prevention of leakage.
Adjust by horizontality, height, and direction

5. Installing hydro turbine unit

Installing hydro turbine unit

6. Flow control adjustment

7. Setting screen

8. Flow test

9. Setting control panel, Wiring work

Setting control panel, Wiring work

10. Starting generation